Elevate your local knowledge
Sign up for the iNFOnews newsletter today!
MISSION, B.C. – A bridge east of Mission, B.C., has partially opened after four days of maintenance that forced commuters to take a 60-kilometre detour.
The Transportation Ministry says crews worked around the clock to replace a damaged steel cap in the weakened Dewdney Slough Bridge.
It says single-lane alternating traffic is now getting through as work continues to reinforce the concrete structure on Highway 7.
Minor delays are expected, with a 30-kilometre-an hour speed limit and a 17,000-kilogram load restriction.
The ministry says drivers with loads exceeding that weight may detour along Highway 1, using either Highway 11 via Mission from the west or Highway 9 through Agassiz from the east.
The bridge is expected to reopen to two-lane traffic and normal load limits by the end of the week.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Want to share your thoughts, add context, or connect with others in your community?
You must be logged in to post a comment.