Elevate your local knowledge
Sign up for the iNFOnews newsletter today!

OTTAWA – The final price tag for a new span at the busiest border crossing between Canada and the United States is out, and so too are some other details about the Gordie Howe International Bridge. Here’s a rundown of some key figures:
$3.8 billion — Estimated cost to design and build the bridge, ports of entry and a highway interchange in Michigan.
6 — Years it will take to build the bridge.
$1.9 billion — Anticipated cost over 30 years to operate and maintain the bridge and its the ports of entry.
$559 million — Amount the federal government has spent since 2005 to get to the point where construction can begin.
400 — Anticipated number of commercial vehicles like trucks expected to cross the bridge every hour.
2,500 — Expected number of jobs directly related to construction of the bridge.
225 — Size, in American football fields, of the green space at the two ports of entry.
162 — The same space, roughly, in Canadian football fields.
2.5 — Length of the bridge in kilometres.
125 — Lifespan of the new bridge in years.
(Source: Windsor Detroit Bridge Authority)
News from © iNFOnews.ca, . All rights reserved.
This material may not be published, broadcast, rewritten or redistributed.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Want to share your thoughts, add context, or connect with others in your community?
You must be logged in to post a comment.