Elevate your local knowledge
Sign up for the iNFOnews newsletter today!
VANCOUVER – B.C. Premier Christy Clark has pointed to Norway as a model for oil pipeline safety that could be used by Enbridge, even as it has proposed a $500 million upgrade to its Northern Gateway project.
Clark said earlier this week her government is looking at the Scandinavian nation’s standards as examples of mitigating risks in high-capacity pipeline projects.
But environmental advocates say the oil pumping through Norway’s pipelines is not the same as the diluted bitumen that will be pumped through the Enbridge pipeline from Alberta through B.C. if that project gets approved.
They argue diluted bitumen sinks to the ocean bottom, while existing technology only works to clean up oil spills along the surface.
Enbridge maintains the substance will initially float, giving the company’s response team leeway to use its equipment to contain a disaster.
Enbridge announced its safety upgrades after a scathing report last week found the company did not fix a pipe defect that caused millions of litres of oil to spill into Michigan’s Kalamazoo River in summer 2010.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Want to share your thoughts, add context, or connect with others in your community?
You must be logged in to post a comment.