{"id":9302,"date":"2026-11-14T12:00:00","date_gmt":"2026-11-14T19:00:00","guid":{"rendered":"https:\/\/infonews.ca\/?p=7979940"},"modified":"2026-11-14T12:00:15","modified_gmt":"2026-11-14T19:00:15","slug":"long-awaited-downtown-kelowna-tolko-projects-first-tenant-will-be-a-power-substation-for-west-kelowna","status":"publish","type":"post","link":"https:\/\/infonews.ca\/inhome\/news\/9302\/long-awaited-downtown-kelowna-tolko-projects-first-tenant-will-be-a-power-substation-for-west-kelowna\/","title":{"rendered":"Long-awaited downtown Kelowna Tolko project&#8217;s first tenant will be a power substation \u2014 for West Kelowna"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Kelowna has its first tenants for a new 40-acre plot of blank downtown waterfront canvas \u2014 a two-acre power substation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It&#8217;s not quite the pop many envisioned from the once-in-a-lifetime opportunity for the city that opened up with the closure of a waterfront mill. Evolving into a bustling planned neighbourhood may take decades, but before it buzzes with hype and interest, it will be buzzing with transformers and power lines for the <a href=\"https:\/\/infonews.ca\/news\/4425568\/city-council-gives-new-vision-for-kelowna-tolko-mill-site-unanimous-approval\/\">3,500 anticipated lakefront homes<\/a> \u2014 but also Westbank First Nation and West Kelowna across the lake, too.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Power is a sensitive issue in the Central Okanagan. The entire Westside needs a backup power source, in case the one source it does have is damaged in, say, a forest fire. Meanwhile, Kelowna&#8217;s rapid growth has <a href=\"https:\/\/infonews.ca\/news\/7965937\/bc-hydro-to-announce-new-ai-data-centres-dont-expect-any-in-the-okanagan\/\">already put pressure on the electrical grid in the region<\/a>, and some developments have been slowed or stalled because of it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It will be years before condos and storefronts fill the largely vacant Tolko land, but Kelowna&#8217;s power utility took the opportunity while it could as the region is increasingly pressed for electricity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">FortisBC said it needed the land to guarantee the 3,500 new homes on the long-awaited Tolko site get power, but it likely would have needed a new substation either way as BC Hydro builds toward a cross-lake connection for the westside&#8217;s backup power.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;To continue to meet future power needs, a new substation is required on the site,&#8221; spokesperson Gary Toft said in an emailed statement.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/infonews.ca\/wp-content\/uploads\/IMG_3904.jpg?w=1024\" alt=\"|\" class=\"wp-image-7979982\" title=\"|\"><figcaption class=\"wp-element-caption\">FortisBC paid $7.4 million to expropriate two acres of this downtown Kelowna property from Tolko. LEVI LANDRY\/iNFOnews.ca <\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The entire site encompasses <a href=\"https:\/\/infonews.ca\/news\/4425568\/city-council-gives-new-vision-for-kelowna-tolko-mill-site-unanimous-approval\/\">40 acres of waterfront property<\/a>, including an eight-acre plot behind the Manhattan Point neighbourhood. It&#8217;s on that property, furthest from the lakeshore along Manhattan Drive and the Okanagan rail trail, where FortisBC plans to build a new substation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It&#8217;s roughly a block away from an established substation on Recreation Avenue and Richter Street. Toft said the older one could serve as a temporary connection for Westside power, but the upcoming Tolko site is FortisBC&#8217;s &#8220;preferred&#8221; option.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The location has one new city councillor questioning whether it&#8217;s the best use of prime Kelowna real estate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;I do understand that Kelowna needs a lot more electrical power,&#8221; Coun. Davis Kyle said. &#8220;But it does seem frustrating to me it&#8217;s going to be taking away land in the highest-density part of the development, where there was a greater opportunity for park land or housing as opposed to a lower-density area with less people.&#8221;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While the design isn&#8217;t known, FortisBC is wary of costs associated with burying power lines, while it doesn&#8217;t typically build underground substations either. So, the two-acre plot in Kelowna&#8217;s next highly anticipated neighbourhood could also be home to a buzzing collection of electrical equipment geared toward powering the Westside.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/infonews.ca\/wp-content\/uploads\/MediaItemID100624-3528.png?w=1024\" alt=\"|\" class=\"wp-image-4227317\" title=\"|\"><figcaption class=\"wp-element-caption\">A conceptual drawing for the Tolko Mill Site redevelopment plan. Submitted\/City of Kelowna<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">It cost FortisBC $7.4 million, but Tolko wanted more. Toft said they couldn&#8217;t negotiate a price, so FortisBC stepped in to expropriate the two-acre plot instead, finalizing the deal this summer.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Tolko has now filed in court to challenge the payment, arguing it should have been more. It did not say how much it should have been paid, and FortisBC hasn&#8217;t responded in court. BC Assessment values the entire property, more than eight acres, at around $28 million.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/kelownapublishing.escribemeetings.com\/filestream.ashx?DocumentId=49113\" target=\"_blank\" rel=\"noopener\">According to city hall reports,<\/a> Kelowna has anticipated a substation to be included in the project since 2024, but FortisBC doesn&#8217;t yet have a design or timeline for the project to be built.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">City officials on both sides of the lake have <a href=\"https:\/\/infonews.ca\/news\/7659231\/why-b-c-doesnt-bury-power-lines-like-ones-planned-for-west-kelowna\/\">voiced their desire for the lines to be buried<\/a>, but Toft said that could be a costly commitment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;Because those costs are ultimately passed on to customers through electricity rates, we place a strong emphasis on keeping energy affordable and carefully weigh whether undergrounding is the most effective way to serve our customers, and safely and reliably deliver the energy they rely on,&#8221; he said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Tolko redevelopment remains a couple decades away from its eventual completion, replacing an industrial engine at the centre of Kelowna with a densely-packed neighbourhood. For now, it is 40 acres of largely vacant land, with a smattering of relics as a reminder of the 80 years mill workers toiled on the Kelowna waterfront.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>It&#8217;s to power the homes eventually built there, but that could have come from anywhere. This location has one important position \u2014 a straight shot across the lake to the Westside.<\/p>\n","protected":false},"author":426,"featured_media":9303,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"guid":"","_duplicate_post":false,"rank_math_canonical_url":"","source":"","byline":"","published":"","updated":"","_infotelid":"","_prepressid":"","_multisite_post_sync":"","_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[1680,541,543],"tags":[1665,16,463],"region":[322,323,324,325],"class_list":["post-9302","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-local","category-topnews","tag-fortis-bc","tag-kelowna-news","tag-tolko-mill-site","region-kamloops","region-kelowna","region-penticton","region-vernon"],"parsely":{"version":"1.1.0","canonical_url":"https:\/\/infonews.ca\/inhome\/news\/9302\/long-awaited-downtown-kelowna-tolko-projects-first-tenant-will-be-a-power-substation-for-west-kelowna\/","meta":{"@context":"https:\/\/schema.org","@type":"NewsArticle","headline":"Long-awaited downtown Kelowna Tolko project&#8217;s first tenant will be a power substation \u2014 for West Kelowna","url":"http:\/\/infonews.ca\/inhome\/news\/9302\/long-awaited-downtown-kelowna-tolko-projects-first-tenant-will-be-a-power-substation-for-west-kelowna\/","mainEntityOfPage":{"@type":"WebPage","@id":"http:\/\/infonews.ca\/inhome\/news\/9302\/long-awaited-downtown-kelowna-tolko-projects-first-tenant-will-be-a-power-substation-for-west-kelowna\/"},"thumbnailUrl":"https:\/\/infonews.ca\/inhome\/wp-content\/uploads\/sites\/4\/inhome-CPT115446441.jpg?w=150&h=150&crop=1","image":{"@type":"ImageObject","url":"https:\/\/infonews.ca\/inhome\/wp-content\/uploads\/sites\/4\/inhome-CPT115446441.jpg"},"articleSection":"Featured","author":[{"@type":"Person","name":"Levi Landry"}],"creator":["Levi Landry"],"publisher":{"@type":"Organization","name":"iNhome","logo":""},"keywords":["fortis-bc","kelowna news","tolko mill site"],"dateCreated":"2026-11-14T19:00:00Z","datePublished":"2026-11-14T19:00:00Z","dateModified":"2026-11-14T19:00:15Z"},"rendered":"<script type=\"application\/ld+json\" class=\"wp-parsely-metadata\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@type\":\"NewsArticle\",\"headline\":\"Long-awaited downtown Kelowna Tolko project&#8217;s first tenant will be a power substation \\u2014 for West Kelowna\",\"url\":\"http:\\\/\\\/infonews.ca\\\/inhome\\\/news\\\/9302\\\/long-awaited-downtown-kelowna-tolko-projects-first-tenant-will-be-a-power-substation-for-west-kelowna\\\/\",\"mainEntityOfPage\":{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/infonews.ca\\\/inhome\\\/news\\\/9302\\\/long-awaited-downtown-kelowna-tolko-projects-first-tenant-will-be-a-power-substation-for-west-kelowna\\\/\"},\"thumbnailUrl\":\"https:\\\/\\\/infonews.ca\\\/inhome\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/inhome-CPT115446441.jpg?w=150&h=150&crop=1\",\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/infonews.ca\\\/inhome\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/inhome-CPT115446441.jpg\"},\"articleSection\":\"Featured\",\"author\":[{\"@type\":\"Person\",\"name\":\"Levi Landry\"}],\"creator\":[\"Levi Landry\"],\"publisher\":{\"@type\":\"Organization\",\"name\":\"iNhome\",\"logo\":\"\"},\"keywords\":[\"fortis-bc\",\"kelowna news\",\"tolko mill site\"],\"dateCreated\":\"2026-11-14T19:00:00Z\",\"datePublished\":\"2026-11-14T19:00:00Z\",\"dateModified\":\"2026-11-14T19:00:15Z\"}<\/script>","tracker_url":"https:\/\/cdn.parsely.com\/keys\/infonews.ca\/p.js"},"post_modified":"2026-11-14T12:00:15","post_modified_gmt":"2026-11-14T19:00:15","jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/infonews.ca\/inhome\/wp-content\/uploads\/sites\/4\/inhome-CPT115446441.jpg","_links":{"self":[{"href":"https:\/\/infonews.ca\/inhome\/wp-json\/wp\/v2\/posts\/9302","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infonews.ca\/inhome\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infonews.ca\/inhome\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infonews.ca\/inhome\/wp-json\/wp\/v2\/users\/426"}],"replies":[{"embeddable":true,"href":"https:\/\/infonews.ca\/inhome\/wp-json\/wp\/v2\/comments?post=9302"}],"version-history":[{"count":0,"href":"https:\/\/infonews.ca\/inhome\/wp-json\/wp\/v2\/posts\/9302\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infonews.ca\/inhome\/wp-json\/wp\/v2\/media\/9303"}],"wp:attachment":[{"href":"https:\/\/infonews.ca\/inhome\/wp-json\/wp\/v2\/media?parent=9302"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infonews.ca\/inhome\/wp-json\/wp\/v2\/categories?post=9302"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infonews.ca\/inhome\/wp-json\/wp\/v2\/tags?post=9302"},{"taxonomy":"region","embeddable":true,"href":"https:\/\/infonews.ca\/inhome\/wp-json\/wp\/v2\/region?post=9302"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}