Elevate your local knowledge
Sign up for the iNFOnews newsletter today!

The nation’s inland cities are raising many bridges in the expectation that climate change will bring more intense storms and more frequent flooding. A look at some of the projects:
___
BRIDGE: Red Multi-Use Trail Bridge
CITY: Des Moines, Iowa
BUILT: 1891, rehabilitated in 2005 and raised higher in 2016-17
ORIGINAL HEIGHT: Walking surface 29.5 feet above river bed
NEW HEIGHT: Surface raised to 34 feet over river bed
COST: $3 million
___
BRIDGE: Eighth Avenue Bridge
CITY: Cedar Rapids, Iowa
BUILT: Removal of bridge built in 1938; new bridge construction to start in 2020
ORIGINAL HEIGHT: 14 feet above Cedar River
NEW HEIGHT: 28 feet
COST: Up to $30 million
___
BRIDGE: Sixth Street Bridge
CITY: Milwaukee
BUILT: New bridge completed in 2011 to replace bridge built in 1982.
ORIGINAL HEIGHT: 10 feet above Kinnickinnic River
NEW HEIGHT: 15 1/2 feet above river
COST: $3 million
___
BRIDGE: Virginia Street Bridge
CITY: Reno, Nevada
BUILT: New bridge completed in 2016 to replace bridge built in 1905.
ORIGINAL HEIGHT: 12 feet above Truckee River
NEW HEIGHT: 15 feet
COST: $18 million
___
BRIDGE: Park Road Bridge
CITY: Iowa City
BUILT: Bridge built in 1959 to be replaced by bridge now under construction. Completion expected in 2018.
ORIGINAL HEIGHT: 9.5 feet over Iowa River
NEW HEIGHT: 15 feet over river
COST: $13 million
News from © iNFOnews.ca, . All rights reserved.
This material may not be published, broadcast, rewritten or redistributed.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Want to share your thoughts, add context, or connect with others in your community?
You must be logged in to post a comment.