Elevate your local knowledge

Sign up for the iNFOnews newsletter today!

Select Region

Power problem at transit hub halts Vancouver SkyTrains during morning commute

VANCOUVER – A temporary electrical issue at downtown Vancouver’s transit hub has caused delays for passengers during their morning commute.

SkyTrains were being turned around at Stadium-Chinatown station before making it to their last three stops downtown for about an hour and a half on Monday.

Metro Vancouver’s transit authority says a power problem at Waterfront Station was to blame for system-wide delays on the Expo and Millennium train lines that began at about 6:40 a.m.

A bus bridge was set up to shuttle people between Stadium-Chinatown, Granville, Burrard and Waterfront, but there was still a significant backup during the already-busy morning rush.

TransLink is warning passengers to expect heavier-than-normal passenger loads as the backup clears.

The Canada Line was not affected. (CKNW, News 1130)

News from © The Canadian Press, . All rights reserved.
This material may not be published, broadcast, rewritten or redistributed.

Join the Conversation!

Want to share your thoughts, add context, or connect with others in your community?

The Canadian Press

The Canadian Press is Canada's trusted news source and leader in providing real-time, bilingual multimedia stories across print, broadcast and digital platforms.