Elevate your local knowledge
Sign up for the iNFOnews newsletter today!

LOS ANGELES – Authorities say a power outage at Dodger Stadium that caused a 23-minute delay of a game between the Milwaukee Brewers and Los Angeles Dodgers was caused by a Mylar balloon that made contact with overhead electrical equipment.
The Los Angeles Department of Water and Power says an automated switch rerouted power to the stadium in two seconds Monday night.
Equipment, however, had to be reset and powered back on by stadium personnel.
The city utility says electrical wires can be melted when metallic balloons come in contact with power lines, causing fires, property damage or an outage.
There are approximately 150 Mylar-related outage incidents citywide annually.
News from © iNFOnews.ca, . All rights reserved.
This material may not be published, broadcast, rewritten or redistributed.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Want to share your thoughts, add context, or connect with others in your community?
You must be logged in to post a comment.